To build the project on time, on budget, and to the hospital’s design requirements, Nordic, working in collaboration with COWI consulting group, needed to take a more modular approach to design and construction. Specific project goals included eliminating workflow redundancies and incorporating automation; improving collaboration and information sharing across disciplines; and ensuring an information-rich, modularized approach across the project lifecycle. To simplify workflows and keep the large project team in sync, Nordic needed the right digital collaboration and modeling tools. Nordic also adopted a design for manufacture and assembly (DFMA) approach to the project, reducing the time needed to design building modules and identify and resolve design clashes.